Every controlled shipment passes through six conditions before release. This is the gate described in Appendix F of the book — running against the same transaction. Toggle a condition, run the evaluation, and see exactly what the architecture does with what you give it.
Transaction
SO-981144 · Export Sale
Product — AXM-2200-RF Rev C · Classification 3A001.b.4
Customer — Orion Avionics Pte Ltd · Singapore
Route
Ship from — United States
Ship to — Singapore
Via — United Arab Emirates (transshipment)
License
LIC-2026-00418
Valid through 2026-08-31
14 of 25 authorized shipments remaining
Six conditions, evaluated simultaneously
Gate outcome
Set your conditions and run the evaluation to see the result.
BLOCKED
▸ View generated evidence record
Five of six conditions passing is not a pass. The gate does not negotiate — it evaluates and decides.